Surface area: Exterior 17.74 X 6.30 General condition: Correct Degraded coating in some places Some roller shutters have operating difficulties Description: 2 modular classrooms configured as communicating classrooms of the ALGECO PROGRESS 2 range RT 2012 compliance. Access by stairs or ramps Interior height 2.75 M Visit possible by appointment The property is sold in the state. IMPORTANT: Pick-up from 03/08/2026 and at the latest for 15 September 2026. - buildings located in a school. Invited to carry out a preliminary visit in order to assess the characteristics of the property, the constraints of dismantling and the conditions of access to the site) Payment terms: Payment within 48 hours by credit card online or bank transfer after receipt of the winning bid confirmation email. Withdrawal procedures: Withdrawal by appointment at the expense of the Buyer after receipt of payment and authorization of withdrawal. Pick-up from 03/08/2026 and at the latest for 15 September 2026. Removal (dismantling - loading - transport and possible restoration of the site) is the sole responsibility of the buyer. The property will be disconnected from all networks before removal
Surface area: Exterior 17.74 X 6.30 General condition: Correct Degraded coating in some places Some roller shutters have operating difficulties Description: 2 modular classrooms configured as communicating classrooms of the ALGECO PROGRESS 2 range RT 2012 compliance. Access by stairs or ramps Interior height 2.75 M Visit possible by appointment The property is sold in the state. IMPORTANT: Pick-up from 03/08/2026 and at the latest for 15 September 2026. - buildings located in a school. Invited to carry out a preliminary visit in order to assess the characteristics of the property, the constraints of dismantling and the conditions of access to the site) Payment terms: Payment within 48 hours by credit card online or bank transfer after receipt of the winning bid confirmation email. Withdrawal procedures: Withdrawal by appointment at the expense of the Buyer after receipt of payment and authorization of withdrawal. Pick-up from 03/08/2026 and at the latest for 15 September 2026. Removal (dismantling - loading - transport and possible restoration of the site) is the sole responsibility of the buyer. The property will be disconnected from all networks before removal