تم تسليم الرسالة إلى المستشار، سيتم التواصل معك قريبًا لحجز موعد.
تم إرسال طلب الشحن الخاص بك وسيقوم أحد المستشارين بالاتصال بك قريباً.
تم إرسال طلب الفحص الخاص بك بنجاح. سيتم الاتصال بك قريبا.

نظرة عامة

السعر
٢,١٤٦ $ ٥٨٥ € ٥٠٠ £ ٤٥٤ $ ٢,٢١٠

الفئة

إنتاج

موديل

السنة
1994

حالة المعدة

الرقم التسلسلي
VF6NA02B1NAF02593

الموقع

رقم التعريف
٤٤٢٥٣٢

الوصف

Rolling stock?

Yes

Vehicle Type

DUMP TRUCK

Brand

RENAULT

Model

C300

Version

19X

Serial Number / VIN

VF6NA02B1NAF02593

Mileage

137148

Number of hours

10050

Power (HP)

26 HP

Energy

DIESEL

Manual / automatic gearbox

MANUAL

PV / GVWR / GWR / TWR

PV : 9630kg / GVW : 19450kg / GVWR : 22950kg

Description

Vehicle Rotating motor Renault C300 19T Truck Significant corrosion of chassis body Studded tires Inspection of 09/10/2025 10050H Sold as is

Date of registration

05/12/1994

Last visit to the mines

09/10/2025

Date and place of visit

By appointment

IMPORTANT

SOLD AS IS

Payment terms

Payment within 48 hours by credit card online or bank transfer after receipt of the winning bid confirmation email.

Withdrawal procedures

Withdrawal by appointment at the expense of the Buyer after receipt of payment and authorization of withdrawal. The Buyer has a period of 7 calendar days to collect the property, from the receipt of the winning bid confirmation email.

Rolling stock?

Yes

Vehicle Type

DUMP TRUCK

Brand

RENAULT

Model

C300

Version

19X

Serial Number / VIN

VF6NA02B1NAF02593

Mileage

137148

Number of hours

10050

Power (HP)

26 HP

Energy

DIESEL

Manual / automatic gearbox

MANUAL

PV / GVWR / GWR / TWR

PV : 9630kg / GVW : 19450kg / GVWR : 22950kg

Description

Vehicle Rotating motor Renault C300 19T Truck Significant corrosion of chassis body Studded tires Inspection of 09/10/2025 10050H Sold as is

Date of registration

05/12/1994

Last visit to the mines

09/10/2025

Date and place of visit

By appointment

IMPORTANT

SOLD AS IS

Payment terms

Payment within 48 hours by credit card online or bank transfer after receipt of the winning bid confirmation email.

Withdrawal procedures

Withdrawal by appointment at the expense of the Buyer after receipt of payment and authorization of withdrawal. The Buyer has a period of 7 calendar days to collect the property, from the receipt of the winning bid confirmation email.


أظهر المزيد عرض أقل
طلب فحص لآلة
احصل على عرض سعر للفحص
خدمة الفحص مقدمة من قبل
Mevas
تواصل مع البائع
الولايات المتّحدة
عضو في موقع المعدات والاليات منذ Oct. 2025
Back